April 2011 EPC Contractor Oil Gas Industry Vacancies

PT. YAMA ENGINEERING , a new growth EPC Contractor in Oil and Gas industry, is immediately seeking highly qualified and experience professional who can work as a team with proven competencies in the whole range of development and improvement initiatives to fill the following positions for:

1. PROJECT MANAGER (SENIOR & JUNIOR)
Graduate Engineering Degree in any discipline
3- 6 Years work experience into EPCI Industries
Good Communication and Project Management Skills.
The Job expect the following skill sets:
Strong Project Management Skills
Strong People Management Skill
Strong Project Execution skill
Strong Project Planning Skills

2. PROCESS ENGINEERS (SENIOR & JUNIOR)
Requirements:
• Education: min. S1 Chemical Engineering Degree.
• Senior: min. 10 years working experience in oil & gas industry.
• Junior: min. 5 years working experience in oil & gas industry.
• Experience of basic engineering, detail engineering, pre-commissioning/ commissioning, start-up for project on Oil & Gas Facilities.
• Expert in Process & Design Simulation, Process Eng. Calculation, HAZID & HAZOP, PFD, Material balance, P&ID, Process Data Sheets, Design and specifications, proposal/project development involving detailed calculation, Process studies, Operating & Shutdown Philosophy, Operating Manual.
• Having knowledge and skill of process engineering software: HYSYS, HTRI, Flaresim, Flarenet and related process engineering software.

3. ELECTRICAL ENGINEERS (SENIOR & JUNIOR)
Requirements:
• Education: min. S1 Electrical Engineering Degree.
• Senior: min. 10 years working experience in oil & gas industry.
• Junior: min. 5 years working experience in oil & gas industry.
• Expert in preparing electrical design, calculations, specifications, data sheets & RFQ.
• Having knowledge and skill of Electrical Engineering Software: ETAP Powerstation, Luxicon, Visual 2.0, PROTEC 2000 and ROCTEX CTM Software.
• Having capability to analyze technical vendor quotation(TBE).
• Having knowledge with International Codes and Standards.

4. INSTRUMENT ENGINEERS (SENIOR & JUNIOR)
Requirements:
• Education: min. S1 Physic/Electrical Engineering Degree.
• Senior: min. 10 years working experience in oil & gas industry.
• Junior: min. 5 years working experience in oil & gas industry.
• Expert in preparing instrument basic design, sizing calculations, specifications, data sheets, RFQ & TBE, preparing pre-commissioning and commissioning procedures.
• Expert in field instrumentation section material such as flow meters, analyzers, gas chromatographs, etc also program logic controller (PLC).
• Having good knowledge and skill of Instrument Engineering software: Ntools ver. 6 & 7, Instrucalc 5.0.
• Having knowledge with International Codes and Standards.

5. STATIC & ROTATING MECHANICAL ENGINEERS (SENIOR & JUNIOR)
Requirements:
• Education: min. S1 Mechanical Engineering Degree.
• Senior: min. 10 years working experience in oil & gas industry.
• Junior: min. 5 years working experience in oil & gas industry.
• Expert in preparing mechanical specifications, data sheets & RFQ.
• Having knowledge with International Codes and Standards related to Design of Static Equipment.
• Having knowledge with calculation software for mechanical calculation: pressure vessel, pumps, compressors, HVAC, air cooler and heat exchanger.
• Having capability to analyze technical vendor quotation (TBE).

6. PIPING ENGINEERS (SENIOR & JUNIOR)
Requirements:
• Education: min. S-1 Mechanical Engineering Degree.
• Senior: min. 10 years working experience in oil & gas industry.
• Junior: min. 5 years working experience in oil & gas industry.
• Good knowledge of piping engineering, piping layout, stress analysis and project management.
• Capable of specifying piping components & familiar with various oil & gas Industry standards for laying out facilities, statutory & insurance guideline for approval of facilities.
• Expert in preparing Piping Specifications, calculations, data sheets & RFQ.
• Having experience to perform site checking of piping system, type of pipe support installed & location in conformance with project construction drawing requirements design instruction & installation procedures.
• Having capability to analyze technical vendor quotation (TBE).
• Having knowledge with International Code & Industry Standard.

7. PIPING STRESS ANALYSIS ENGINEERS (SENIOR & JUNIOR)
Requirements:
• Education: min. S-1 Mechanical Degree.
• Senior: min. 10 years working experience in oil & gas industry.
• Junior: min. 5 years working experience in oil & gas industry.
• Good knowledge of piping engineering & pipe support design.
• Familiar with calculation and preparing reports of piping stress analysis using Autopipe plus or Caesar II 5.2.
• Having capability to analyze technical vendor quotation (TBE).
• Having experience to perform site checking of piping system, type of pipe support installed & location in conformance with project construction drawing requirements design instruction & installation procedures.

8. DESIGN CHECKERS (SENIOR & JUNIOR)
Requirements:
• Discipline: Piping, Mechanical, Electrical, Instrument & Civil/Structural.
• Education: min. Technical/Senior High School + AutoCAD Course.
• Experience: min. 5 years experience in similar position.
• Expert in designing all aspect engineering based on disciplines.
• Good experience to check all drawings/inter-discipline drawings and vendor data.
• Good knowledge on AutoCAD (piping, mechanical, instrument and vessel design).

9. DRAFTSMEN (SENIOR & JUNIOR)
Requirements:
• Discipline: Piping, Mechanical, Electrical, Instrument & Structural.
• Education: Technical/Senior High School + AutoCAD Course.
• Experience: min. 5 years in similar position.
• Good knowledge of discipline engineering drawings.
• Familiar & expert with drawing software (AutoCAD all version – Autoplant/ Isoplant, etc related to the discipline).
• Skilled to prepare drawings on discipline aspect based on design drawings cord. Instructions.

10. PLANNER & SCHEDULERS (SENIOR & JUNIOR)
Requirements:
• Education : min. S1 any discipline of engineering.
• Senior: min. 10 years working experience in oil & gas industry.
• Junior: min. 5 years working experience in oil & gas industry.
• Experience working on projects across a full life cycle from FEED, cost estimation, detailed design, construction and commissioning.
• Fully experience utilizing Primavera software, Microsoft Project or other relevant planning system.
• Able to define milestone, collect information, prepare progress report and compare with project schedule during project execution.
• In depth understanding of Maintenance Work Processes and Principals.

10. PROJECT ENGINEERS (SENIOR & JUNIOR)
Requirements:
• Discipline: Electrical & Instrument, Piping, Mechanical, Civil/Structural.
• Education : min. S1 Degree in Engineering background.
• Senior: min. 10 years working experience in oil & gas industry.
• Junior: min. 5 years working experience in oil & gas industry.
• Good knowledge of project management, estimation, procurement, construction related to process equipment.
• Able to be a “Leader” to direct and manage a project team.
• Able to demonstrate leadership, ownership of works and integrity.
• Able to create and starter plan such as kick off meeting, organization, manpower plan, office facilities and budget plan, IT & permit requirement.
• Having the wide range of understanding on engineering key documents i.e. Plot Plan, PFD, P&ID, General Specification, International Code and Standard, HAZID & HAZOP, etc.
• Having high awareness of Contract/Agreement content including legal implication.
If you meet the requirements, please send your comprehensive resume with recent photograph & contact number in MS Word format only in English with current & expected salary. Please indicate the position as email subject to:

susieboedja@consultant.com or susilaningsih@yamaengineering.com

All applicants will be treated as strictly confidential. Only a short list of candidates will be interviewed.

Related Jobs:

Loading

10 Responses - Add Yours+

Please send your job application letter to the address or email address that's already include in post above. If you have a comment, please leave a reply here. Don't waste your time by sending your resume, cv, application in comments page. That will not be respond. Thanks. Perhatian: JANGAN MENULISKAN DATA PRIBADI ANDA DI KOLOM KOMENTAR karena dapat disalahgunakan oleh pihak yang tidak bertanggung jawab. Kirim CV anda ke alamat / email yang telah disebutkan diatas untuk pengiriman lamaran anda.

  1. Sisi Citra Sulani says:

    Name : Sisi Citra Sulani
    Born : Medan, 25 June 1985
    Age (per 1st Jan 2011): 25 years old
    Gender : Female
    Religion : Moslem
    Marital Status : Single
    Height : 172 cm
    Weight : 75 kg
    Nationally : Indonesian
    Adress : jl.sisir kabupaten kaimana PAPUA BARAT
    Education : SI, TEKNIK MESIN / SI ENGINEERING
    Phone : 082198905798

  2. Mubijono Sugeng Rahardjo says:

    CURRICULUM VITAE

    NAME:Mubijono Sugeng Rahardjo, Ir

    DATE OF BIRTH:October 06, 1963

    MARITAL STATUS:Married

    EDUCATION:Chemical Engineering, University of Pembangunan Nasional, Surabaya. Graduated in 1989.

    RESIDENCE : Jl. Krukut Indah 22, RT 01/02, Kelurahan Krukut,
    Cinere
    PHONE : 0818980326

    MAIL : mubijono_rahardjo@yahoo.com

    He has more than seventeen year experiences for Engineering, Procurement, Fabrication & Construction works. the projects were already carried out are as follows: the oil ? gas production facilities, Drilling Site Preparation & Access Roads, Civil Foundation-Steel Structure, Petrochemical Industries, Power Plant, Fire Protection system, Pipeline Construction

    EXPERIENCE

    Mar 2006 ? Present : PT.Damai Mitra Perkasa
    As Project Director

    Jun 2010 ? Sept 2010 : As Project Director for Pipeline Gas Transmisi 4?-10.7 km area Waru ? Rungkut Surabaya
    Client : Ditjen Migas ? Echo Zorro 81
    Location : Waru – Surabaya East Java

    Dec 2009 ? Jan 2010 : As Project Director for Fire Equipment supply for the
    Project of Refinery Mini Plant

    Client : TWU (Triwahana Universal)
    Location : Bojonegoro ? East Java

    Responsibilities : Supply/ Procurement

    PT. Damai Mitra Tama : Apr 2006 ? Oct 2009

    Jan 2008 ? Jul 2008 : As Project Director for EPC Fire Protection System

    Client : Barata Indonesia – GeoLink Nusantara
    Location : Tuban ? East Java

    Responsibilities : Engineering, Procurement,
    Construction & Commissioning

    Sep 2008 ? Mar 2009 : As Project Director for EPC Fire Protection System

    Client : Salwa ? Triwahana Universal (TWU)
    Location : Bojonegoro ? East Java

    Responsibilities : Engineering, Procurement,
    Construction & Commissioning

    Apr 2006 ? Jul 2007 : As Project Director for the Pipeline Gas Distribution Project (PGN Paket 18 ) Bogor area
    Client : Rabana ? Hutama JO & Perusahaan Gas Negara (PGN)
    Location : Bogor (West Java)

    Responsibilities : Construction & Commissioning

    Jun 2007 ? Oct 2007 : As Project Director for the Pipeline Gas Distribution Project (PGN Paket 18 ) Branchline Summarecon
    Client : Rabana ? Hutama JO & Perusahaan Gas Negara (PGN)
    Location : Summarecon – Tangerang (West Java)

    Responsibilities : Construction & Commissioning

    Apr 2009 ? Oct 2009 : As Project Director for the 6 km -10?Pipeline Gas Distribution Project (PGN Paket 18 ) Branchline Indocement ? Bogor, West
    Client : NINDYA KARYA & Perusahaan Gas Negara (PGN)
    Location : Indocement (West Java)

    Responsibilities : Construction & Commissioning

    PT. Sima Surya Perkasa : Jul 2009 ? Jul 2010

    Jul 2009 ? Jul 2010 : As Project Director for the Construction Services LongTerms Project, Development Project of Chevron Pacific International(CPI)

    Client : Chevron Pacific International(CPI)
    Multi Structure

    Location : Duri (Riau)

    Responsibilities :

    Procurement, Construction,Fabrication & Precommissioning for pipeline, dismantling pipeline, Storage Tank and Electrical/Instrument

    PT. Mitrasani Lestarinusa : Feb 2005 ? Mar 2006

    Jul 2005 ? Oct 2005 : As General Manager for Drilling Site Preparation- Pagerungan Besar Project
    Client : EMP – Kangean
    Location : Pagerungan Besar Island
    Responsibilities : Engineering & Construction

    Nov 2005 ? Mar 2006 : As General Manager for Drilling Site Preparation & Access Roads Semberah 07 (SBR 07) & Semberah 09 (SBR 09)Pagerungan Besar Project
    Client : Sembrani Oil (Semco)
    Location : East Kalimantan

    Client : Lapindo Brantas, Inc
    Location : Porong ? East Java
    Responsibilities :
    Drilling Site Preparation for 13 Well Location
    Access Roads Construction
    Burner Pit Construct, etc
    Responsibilities : Engineering & Construction

    PT. Fikamtama Grahanusa : Jan 1998 ? May 2005

    Dec 2004 ? Mar 2005 : As Project Director for Pinggir Landfill Interim Solid Waste handling Project

    Client : Caltex Pacific Indonesia (CPI) ? Thiess Contractors Indonesia
    Location : Duri ? Riau

    Responsibilities : Engineering & Construction

    Dec 2004 ? Mar 2005 : As Project Director for Pungut Well Test Manifold Project Project
    Client : Caltex Pacific Indonesia (CPI) ? Thiess Contractors Indonesia
    Location : Duri ? Riau

    Responsibilities : Engineering & Construction

    Aug 2004 ? Dec 2004 : As Project Director for Pungut Water Flood
    Stage-1 Packaged Project (4? Flowlines 5 Km)
    Client : Caltex Pacific Indonesia (CPI) ? Thiess Contractors Indonesia
    Location : Duri ? Riau

    Responsibilities : Engineering & Construction

    Mar 2002 ? Jul 2002 : As Project Director for the supply of Pig Launcher & Receiver completed
    Client : Lapindo Brantas, Inc
    Location : Porong ? East Java

    Responsibilities : Engineering & Construction

    Aug 2001 ? Nov 2001 : As Project Director for the supply of Diesel Fire Pumps & Jockey Pumps
    Client : Lapindo Brantas, Inc
    Location : Porong ? East Java

    Responsibilities :

    Engineering & Construction for Fire Pumps system
    Piping & Instrument Instalation
    Start up & Commissioning

    Apr 2001 ? May 2001 : As Project Director for the supply of Valves & Pipe Fittings
    Client : Lapindo Brantas, Inc
    Location : Porong ? East Java

    Responsibilities : Supply & Deliver to Lapindo Site

    Apr 2001 ? May 2001 : As Project Director for the supply of Pipe ERW API 5L Gr B and seamless Pipe

    PT. Central Karya Persada : Mar 1996 ? Dec 1997

    Apr 1996 ? Jul 1996 : As Project Director for the Kilang Vecolina Project

    Client : Bakrie Kilang Vecolina
    Location : Mudi Field?s , Tuban ? East Java

    Responsibilities :
    Equipment Erection & Steel Structure Fabrication ? Erection
    Mechanical/ Piping Construction

    Apr 1996 ? Jul 1996 : As Project Director for the Drilling Site Preparation Project

    Client : Lapindo Brantas, Inc
    Location : Porong ? East Java

    Responsibilities :
    Drilling Site Preparation for 13 Well Location
    Access Roads Construction
    Burner Pit Construct, etc

    Feb 1997 ? Jul 1997 : As Project Director for the Project of DIPASENA POWER PLANT 1

    Client : WARTSILA FINLAND
    Location : North Lampung / Dipasena Location

    Responsibilities :
    Foundation for 6 EA Engine & Power House
    Steel Structure Fabrication & Erection
    Piping Construction

    Aug 1997 ? Dec 1997 : As Project Director for the Test Separator Project
    Client : Lapindo Brantas, Inc
    Location : Porong ? East Java

    Responsibilities :

    Engineering, Procurement & Fabrication for Test Separator complete with Piping & Instrument system
    Start Up & Commissioning

    PT. ERRAENERSI KONSTRUKSINDO : Dec 1995 ? Jun 1996

    Dec 1995 ? Mar 1996 : As Project Manager for the Noodle Factory Project

    Client : Sentrafood (MEDCO)
    Location : East Kerawang ? West Java

    Responsibilities :
    Engineering, Procurement, Construction & Erection for Mechanical Equipment complete with Piping & Instrument system
    Start Up & Commissioning

    Dec 1995 ? Mar 1996 : As Project Manager for Inlet Manifold Project

    Client : JOB Pertamina-Santaa Fe Jabung
    Location : Tanjung Jabung – Sumatra

    Responsibilities :
    Engineering, Procurement & Fabrication

    PT. BETASURYA TATAGRAHA : Jan 1995 ? Oct 1995

    Jan 1995 ? Oct 1995 : As Project Manager for EPC NO FLARE GAS
    PROJECT ( Block Station with 5 Unit Gas Booster
    Compressor)

    Client : JOB Pertamina EP
    Location : Cemara & Kandang Haur Timur, Cirebon West Java

    Responsibilities :
    Engineering, Procurement & Construction
    Prepare for EPC Management
    Progress Report
    Start Up & Commissioning

    PT.SANGKALA SAKTI : Jan 1994? Dec 1994

    Jan 1994 ? Jun 1994 : As Project Engineer of Cooling Water Modification
    Project for ARCO BALI NORTH

    Client : ARCO BALI NORTH
    Location : Pagerungan Island

    Responsibilities :
    Engineering Data Sheet
    Prepare for Piping Isometric & Piping Lay out Drawing
    Process Simulation
    Matetrial Take off

    Jun 1994 ? Dec 1994 : As Process Engineer Consultant for ASAMERA ?
    DURI PIPELINE, 28? Dia ? 560 KM, Development
    Project of Perusahaan Gas Negara (PGN)

    Client : PGN (Perusahaan Gas Negara)

    Responsibilities
    Basic Design
    Pipeline Simulation (pipephase Simsci)
    Pipeline Sizing
    Process Flow Diagram (PFD) & Piping & Instrument Diagram (P & ID)
    Mechanical Data Sheet
    Process & Control

    PT.ERAMINA KENCANA : Jan 1993? Dec 1993

    Jan 1993 ? Dec 1993 : As Process Engineer for Ambon Terminal BBM
    Project
    Client : Pertamina
    Location : Ambon

    Responsibilities :
    Basic Design
    PRO/II (Process Simsci)
    Automation system
    Process Flow Diagram (PFD) & Piping & Instrument Diagram (P & ID)
    Mechanical Data Sheet
    Process & Control

    PT.TRIPATRA ENGINEERING : Jan 1990? Dec 1992

    Jul 1992 ? Dec 1992 : As Process Engineer for modification of ? Widuri
    Process Offshore Platform, development Project
    of Maxus South East Sumatra Inc

    Client : Maxus South East Sumatra Inc.
    Location : Pabelokan, Sumatra Offshore
    Scope of work :
    Engineering for Power Generation facility and Produce Water handling

    Responsibilities :
    Process Flow Diagram (PFD) & Piping & Instrument Diagram (P & ID)
    Equipment Sizing and selection
    Line Sizing
    Material Balance and Fire Water sizing

    Jan 1992 ? Jun 1992 : Process Engineer to PT. NISCONI for EWW, EWY
    and SBA Offshore Platform, Development project of
    PT. Atlantic Richfield Indonesia (ARCO)

    Client : PT. Atlantic Richfield Indonesia (ARCO)
    Location : East Java Offshore

    Scope of work :
    Engineering for gas, oil gathering and production system (Offshore)

    Responsibilities :
    Process Flow Diagram (PFD) & Piping & Instrument Diagram (P & ID)
    Process Simulation (Simsci)
    Equipment Sizing and selection
    Line Sizing
    Material Balance and Heat Balance

    Jan 1991 ? Dec 1991 : Process Engineer to PT. PT. KOMARITIM for
    BTSA and BZZB Offshore Platform. Development
    project of PT. Atlantic Richfield Indonesia (ARCO)

    Client : PT. Atlantic Richfield Indonesia (ARCO)
    Location : East Java Offshore

    Scope of work :
    Engineering for gas, oil gathering and production system (Offshore)

    Responsibilities :
    Process Flow Diagram (PFD) & Piping & Instrument Diagram (P & ID)
    Process Simulation (Simsci)
    Equipment Sizing and selection
    Line Sizing
    Material Balance and Heat Balance

    Jul 1991 ? Sep 1991 : Process Engineer to PT. PT. NISCONI for
    BK Offshore Platform. Development
    project of PT. Atlantic Richfield Indonesia (ARCO)

    Jan 1991 ? Dec 1991 : Process Engineer to PT. PT. KOMARITIM for
    BTSA and BZZB Offshore Platform. Development
    project of PT. Atlantic Richfield Indonesia (ARCO)

    Client : PT. Atlantic Richfield Indonesia (ARCO)
    Location : East Java Offshore

    Scope of work :
    Engineering for gas, oil gathering and production system (Offshore)

    Responsibilities :
    Process Flow Diagram (PFD) & Piping & Instrument Diagram (P & ID)
    Process Simulation (Simsci)
    Equipment Sizing and selection
    Line Sizing
    Material Balance and Heat Balance

    Client : PT. Atlantic Richfield Indonesia (ARCO)
    Location : East Java Offshore

    Scope of work :
    Engineering for gas, oil gathering and production system (Offshore)

    Responsibilities :
    Process Flow Diagram (PFD) & Piping & Instrument Diagram (P & ID)
    Process Simulation (Simsci)
    Equipment Sizing and selection
    Line Sizing
    Material Balance and Heat Balance

  3. slopers says:

    Someone necessarily assist to make severely posts I would state. This is the very first time I frequented your website page and to this point? I surprised with the analysis you made to make this actual post amazing. Fantastic process!

  4. That is awfully beneficial stuff. Thanks for all the passion to supply these helpful information here.

Leave a Reply

Please send your job application letter to the address or email address that's already include in post above. If you have a comment, please leave a reply here. Don't waste your time by sending your resume, cv, application in comments page. That will not be respond. Thanks.